OP
Deleted member 26818
Thought that when doing a MWC you were to test the circuit you have modified, not just your new bit.
Section 3 on the MWC is titled, INSPECTION AND TESTING OF THE MODIFIED CIRCUIT AND RELATED PARTS. to me this means all of it[FONT=Calibri, Arial, Helvetica, sans-serif]https://www.parcel2go.com/dhl-parce...ml_dhltrackingalert&type=email&location=email[/FONT]
It doesn't state such on the model forms in BS7671.
There are 4/5 essential tests listed that should be caried out, some of them will include the existing part of the circuit.
Such as earth continuity, IR and perhaps if applicable an RCD test.
Now if you want to check Zs, polarity correct etc. at each point on the circuit, please do so, just be aware that it is not a requirement of BS7671 to do so.