Had my 2330 L3 Inspect and Test a few weeks ago and am just filling in the paperwork to be handed in Monday.
Im at the end of it.....Test of RCD and want to make sure Ive got the layout right.....
Method of Testing: Fluke meter that college supplied. Not sure of model.
Trip current mA: x0.5 0 degs, x.5 180 degs, x1 0 degs, x1 180 degs, x5 0 degs, x5 180 degs
Trip time mS: >200mS, ??.?mS, etc etc.
Is this correct?
Cheers,
Mike.