Got my 2330 lvl 3 practical on Monday, but i have not been given the opportunity to have a go at the installation which we have to test. I’m pretty confident about most of the circuit’s except the motor circuit.
1). is R1 + R2 taken at the contactor or is the contactor manually held in and reading taken from the motor?
2). is the contactor held in for the insulation resistance test??
Thanks in advance
1). is R1 + R2 taken at the contactor or is the contactor manually held in and reading taken from the motor?
2). is the contactor held in for the insulation resistance test??
Thanks in advance