Hello i want to complete my 2356 before Dec, i currently work part time as an Electrician.
Im back on site on Tuesday and i want to start taking pictures.
What pictures do i need?
ENSURE SAFE SITE WORKING: Pictures of building scaffolding, pictures of step ladders with boots, hard hat and hi vis? Pics of warning signs?
DIAGNOSE AND CORRECT FAULTS: Pics of covers off, test lamps and meters??
PROVIDE TECHNICAL INFORMATION TO RELEVANT PEOPLE: Pics of site drawings, instructions from materials, jobs sheets etc?
MAINTAIN A SAFE WORKING ENVIRONMENT: Pics of a clean and tidy worksite???
PREPARE TO INSTALL ELECTRICAL WIRING AND ENCLOSURES: Pics of spirt level, marking out, measuring???
INSTALL ELECTRICAL WIRING SYSTEMS AND ENCLOSURES: Pics of armoured, T&E? Tray? Trunking, conduit? Do i need to use 3 types of cable, as i only really use T&E and armoured?
CONNECT WIRING SYSTEMS: Pics of connecting armoured, singles, T&E?
INSPECT & TEST: pics of testing 3 jobs?
I understand that you need 3 different examples for each unit, but if a 1 jobs covers more than one unit for example i use armoured, t& e and tray in 1 job can i just use this?
How many pictures do i need for each section on average?
Do i need to wear a hard hat and hi vis in all pictures?
Any help would be great, cheers.
Im back on site on Tuesday and i want to start taking pictures.
What pictures do i need?
ENSURE SAFE SITE WORKING: Pictures of building scaffolding, pictures of step ladders with boots, hard hat and hi vis? Pics of warning signs?
DIAGNOSE AND CORRECT FAULTS: Pics of covers off, test lamps and meters??
PROVIDE TECHNICAL INFORMATION TO RELEVANT PEOPLE: Pics of site drawings, instructions from materials, jobs sheets etc?
MAINTAIN A SAFE WORKING ENVIRONMENT: Pics of a clean and tidy worksite???
PREPARE TO INSTALL ELECTRICAL WIRING AND ENCLOSURES: Pics of spirt level, marking out, measuring???
INSTALL ELECTRICAL WIRING SYSTEMS AND ENCLOSURES: Pics of armoured, T&E? Tray? Trunking, conduit? Do i need to use 3 types of cable, as i only really use T&E and armoured?
CONNECT WIRING SYSTEMS: Pics of connecting armoured, singles, T&E?
INSPECT & TEST: pics of testing 3 jobs?
I understand that you need 3 different examples for each unit, but if a 1 jobs covers more than one unit for example i use armoured, t& e and tray in 1 job can i just use this?
How many pictures do i need for each section on average?
Do i need to wear a hard hat and hi vis in all pictures?
Any help would be great, cheers.