La Poste
-
The first floor of a commercial unit is to be inspected and tested for insurance purposes.
The installation forms part of a 400V three phase four wire TN-C-S system.
The offices are supplied from a 100A three phase four wire fused switch at the origin of the installation and one 25mm five core SWA cable with copper conductors.
State:
The documents to be completed and passed to the client on completion of the periodic inspection and test. (6 marks)
The thing I am not sure about with this question is why it is awarded six marks.
Obviously I have to provide a periodic inspection report along with schedule of inspections and schedule of test results for the office but this would be three marks.
Do I have to do another periodic for the supply cable from the origin separately?
Or are the other three marks because I have to give two copies, one for the client and one for the insurance company.
I'm not really sure on this one.
Any comments appreciated.
Thanks.
The installation forms part of a 400V three phase four wire TN-C-S system.
The offices are supplied from a 100A three phase four wire fused switch at the origin of the installation and one 25mm five core SWA cable with copper conductors.
State:
The documents to be completed and passed to the client on completion of the periodic inspection and test. (6 marks)
The thing I am not sure about with this question is why it is awarded six marks.
Obviously I have to provide a periodic inspection report along with schedule of inspections and schedule of test results for the office but this would be three marks.
Do I have to do another periodic for the supply cable from the origin separately?
Or are the other three marks because I have to give two copies, one for the client and one for the insurance company.
I'm not really sure on this one.
Any comments appreciated.
Thanks.