2391 PIR 4th assesment | on ElectriciansForums

Discuss 2391 PIR 4th assesment in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net

john25

-
Joined
Sep 14, 2009
Messages
559
Reaction score
46
Location
Liverpool
So I just my practical Exam tonight which I failed the PIR Due to running out of time (I passed the other 3 assessments) but I didn't know how to do an R1+R2 test on a MICC cable so I lost too much time doing that (did it in the end like) But anyways the examiner said that even though I was very nervous (which I always am when im being watched under Exam Conditions for some strange reason lol) I was very competent in my ability to explain and do the tests I did know and is confident that I'll defo pass it so im booked in to do the 4th assesment again tomorrow night. So I got a few questions that I hep with .

Basically what do I put down on the PIR as the main switch/Circuit breaker as it's a PIR of a single phase CU with a 3 phase DB but there is a Isolator with a 20A BS-88 fuse in it ??

also what do I put down as the Overcurrent device on the schedule of Test results as I never got to finish the Paperwork in the Exam i just have written out a PIR and just need those 2 bits of info.


and Finally what is the proper way of doing the 10 step safe isolation as he said my way was very strange (L1-L2 L1-L3 L1-N L1-E L2-L3 L2-N L2-E L3-N L3- E N-E) ???

Thanks
 
Last edited:

Reply to 2391 PIR 4th assesment in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
298
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
807
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
848

Similar threads

  • Question
I believe that it is incorporated into the 5 days. But will double check. Thanks.
Replies
6
Views
990
  • Question
Had this before, found by the DNO to be a corroded fuse carrier on a pole mounted fuse on their LV network
Replies
1
Views
716

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top