Hi fellas. Not been on here for while hope everyone's well. To my surprise I passed 2394/95 theory first time with alot of help from you lot (many thanks) unfortunately I run out of time with 2394 exam (2 hours to test and initial verication of new installation) I'm keen learner but unfortunately due to work been doing not gained great deal testing experience other than testing own property and trying to get quicker at this : ) Any tips on how I could speed up and thoughts on how I plan to test this install appreciated and if I'm breaking any safe procedures or anything examiner may fail me on.
Rig consists of 2 boards one supplying other.
Board A
Three phase socket
Three phase isolator
Lighting 2 way intermediate
Radial fcu
Ring circuit
3 phase DOL starter
Distribution circuit to board B
Bonding to water
Bonding to Gas
Bonding to Tray
Board B
2 way lighting
Radial
3 phase sockets
Way I'm intending to test this time is Safe isolate both boards. Fill forms. Phase test board A. ZE board A. Then work through test sequence through sheet doing each circuit at a time in the sequence of sheet. R1 + R2 test method one on radials. Correct in thinking this means R2 not required, confirms polarity and can add this to Ze to give me Zs of circuit? Where Rings concerned do the 3 separate tests and test any RCD'S last when board is reenergised. Then move on to board B. Phase sequence again, Ze (isolate board A and just test R1 + R2 of distribution circuit and add this to Ze of board A?)
Thoughts appreciated, if made glaring mistakes excuse me been a long day
Rig consists of 2 boards one supplying other.
Board A
Three phase socket
Three phase isolator
Lighting 2 way intermediate
Radial fcu
Ring circuit
3 phase DOL starter
Distribution circuit to board B
Bonding to water
Bonding to Gas
Bonding to Tray
Board B
2 way lighting
Radial
3 phase sockets
Way I'm intending to test this time is Safe isolate both boards. Fill forms. Phase test board A. ZE board A. Then work through test sequence through sheet doing each circuit at a time in the sequence of sheet. R1 + R2 test method one on radials. Correct in thinking this means R2 not required, confirms polarity and can add this to Ze to give me Zs of circuit? Where Rings concerned do the 3 separate tests and test any RCD'S last when board is reenergised. Then move on to board B. Phase sequence again, Ze (isolate board A and just test R1 + R2 of distribution circuit and add this to Ze of board A?)
Thoughts appreciated, if made glaring mistakes excuse me been a long day