woko
Hi, I'm due to install a 3.6Kw system on a property with an existing 6Kw Wind turbine.
I have applied for it with the DNO because it already has the 6Kw wind turbine.
The installation is 3 Phase and I intend to connect the PV system to a different phase to the wind turbine.
Has anybody had any problems with applying for installations with existing microgeneration?
TIA
I have applied for it with the DNO because it already has the 6Kw wind turbine.
The installation is 3 Phase and I intend to connect the PV system to a different phase to the wind turbine.
Has anybody had any problems with applying for installations with existing microgeneration?
TIA