Got my approved test on monday, this involves testing a main switch room. done some 3 phase testing ,many moons ago tho!!! my ?s are, to test the the phase sequence which is to verify that its the same through out where do you test at ? and is this just carried out on a continuity test?? and all fuses removed or c/bs switched off for Ze test??? earth and neautral combined on a 3 probe instrument??think i have FRIED my brain with all the calculations and drawings i have looked at!! any advice would be great thanks!!!!!