Hi everyone
Putting a Kitchen and Utility on a new ring final circuit.
The Utility is single storey with a concrete roof so I'm using the 150mm top zone.
I am within 100mm of the double insulated combi boiler flue. The cable will be buried but do you think this would dissipate the heat? Thinking of 528.3 and I'm concerned.
Any thoughts?
Thanks in advance. Regards, David
Putting a Kitchen and Utility on a new ring final circuit.
The Utility is single storey with a concrete roof so I'm using the 150mm top zone.
I am within 100mm of the double insulated combi boiler flue. The cable will be buried but do you think this would dissipate the heat? Thinking of 528.3 and I'm concerned.
Any thoughts?
Thanks in advance. Regards, David
Last edited: