Just doing some certificates and noticed two minor works for one bathroom job. One for shower replacement with new switch, one for light and lv fan. Part P certs both exactly the same,'circuit alteration or addition in special location'. Do I need to send two? Just a thought rather than a prob. Cheers. Ian.