We have been asked to add to a customers system.
They have an Anglian 1.9 kW system on the home on the 43p rate.
The customer wants to add 4 kW onto his garage.
A) Is the 43p rate safe and ring fenced for the 1.9 kW ?
B) Will he get 15p on the next 2.1 kW and then 13p for the remainder or 13p for all the new system as it takes him over the 4kW threshold ?
C) Do I need to connect to the existing meter or is the addition a new meter ?
D) If the customer swops his electric to a new supplier would he get away with a new fit contract in addition to the one he has with his old import company,
Not to worried about the actual rates more the principle.
Sorry but not had to get involved with this sort of thing before and wanted to get some options and advice
Thanks
They have an Anglian 1.9 kW system on the home on the 43p rate.
The customer wants to add 4 kW onto his garage.
A) Is the 43p rate safe and ring fenced for the 1.9 kW ?
B) Will he get 15p on the next 2.1 kW and then 13p for the remainder or 13p for all the new system as it takes him over the 4kW threshold ?
C) Do I need to connect to the existing meter or is the addition a new meter ?
D) If the customer swops his electric to a new supplier would he get away with a new fit contract in addition to the one he has with his old import company,
Not to worried about the actual rates more the principle.
Sorry but not had to get involved with this sort of thing before and wanted to get some options and advice
Thanks