i Have sold 3Kw to a customer who already has 3.25Kw on another roof. It is the first time i have had to pre notify the DNO so am unsure which forms i need and the cost involved as well as time.
Its for SSE,
he has a fronius 3.0 existing with 3.33Kw of panels
i want to add 3 KW of panels with a solar edge SE3000, is it just the G59 application form? How much do these cost and how long before they decide?
Thanks
Its for SSE,
he has a fronius 3.0 existing with 3.33Kw of panels
i want to add 3 KW of panels with a solar edge SE3000, is it just the G59 application form? How much do these cost and how long before they decide?
Thanks