Hi as i am a new guy i can't do a diagram so will have to explain.

Have just done a job for a plumber adding a wet under floor heating system to a Y plan heating system.

I have got a time clock operating a new 2 port Honeywell motorised valve.

When the time clock is calling for heat the valve opens. I have a permanent live on the grey wire and have linked the orange wire to the orange of the existing 3 port Honeywell valve.

This appears to work but am still having a few problems so do not know if it is electrical or plumbing.

Hope i have expained it OK.

Cheers
 
Hi as i am a new guy i can't do a diagram so will have to explain.

Have just done a job for a plumber adding a wet under floor heating system to a Y plan heating system.

I have got a time clock operating a new 2 port Honeywell motorised valve.

When the time clock is calling for heat the valve opens. I have a permanent live on the grey wire and have linked the orange wire to the orange of the existing 3 port Honeywell valve.

This appears to work but am still having a few problems so do not know if it is electrical or plumbing.

Hope i have expained it OK.

Cheers

So, what problems are you having?
 
The boiler starts up and pump but under floor heating does not get hot, (although the pipes are hot up to the new motorised valve) it seems to be pumping the wrong way up the return and back down the flow and not through the motorised valve even though it is open. This seems to rectify itself when the main central heatig is turned on.
 
In that case that's wrong. If the take off for the ufh is after the 3pv then the ufh cannot get any water untill the main heating is on and the 3pv is open on that port.

TBH the system should have been converted to an S plan plus. If the original section really must remain as Y plan, then you need two 2pv's anyway and the take off for the ufh should be before the 3pv with a 2pv to close off feed to the y plan because a 3pv never actually closes off (one port is always open, which port depends on the signals it recieves and what it was doing last).
 

Reply to Adding wet under floor heating to a Y plan in the Central Heating Systems area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
300
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
812
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
865

Similar threads

glad it was such a simple fix..... And good job the previous owners didnt take it with them
Replies
6
Views
722
D
  • Article
W-plan pump run on Son recently moved into a 20 year old house with what appears to be a W-plan system using, I think a Worcester Bosch Greenstar...
Replies
0
Views
196
davidwf
D

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top