Hi
Got a job coming up on a village hall with a large roof overhang. The inverter is going to located in a plant room which is at the opposite ends to were the PV panels are mounted.
Ive not done a job like this before and therefore i need some advice.
The main DC cables are coming from the plant room, under the floor then out and up the wall to the roof - my query is: Because of the large overhang how do i get the cables onto the roof? Naturelly i cant take the around the guttering, so is it ok to make a small opening in the overhang and feed the DC cables upto the array under the tiles and bring them out under the array?
With it being a village hall there are high open vaulted ceilings inside and normally im used to working in loft spaces.
Any help would be appreciated.
Got a job coming up on a village hall with a large roof overhang. The inverter is going to located in a plant room which is at the opposite ends to were the PV panels are mounted.
Ive not done a job like this before and therefore i need some advice.
The main DC cables are coming from the plant room, under the floor then out and up the wall to the roof - my query is: Because of the large overhang how do i get the cables onto the roof? Naturelly i cant take the around the guttering, so is it ok to make a small opening in the overhang and feed the DC cables upto the array under the tiles and bring them out under the array?
With it being a village hall there are high open vaulted ceilings inside and normally im used to working in loft spaces.
Any help would be appreciated.