Our AM2 spec asks that we take...
Supply in to the first 2 way switch, out to an intermediate switch, out of this to the final 2 way switch and then up to a light fitting.
All has to be done in 1.5 T+E and 1.5 3 Core using the minimum amount of cables.
Does anyone have any experience with this technique as its not something I have ever had to consider while at work or college in the past.
Thanks for any help
James