Hi, I have a couple of questions from the am2.
The install bays have the cutout fuses in a adaptable box with just a banana plug on the earth. This then acts as the met up in the cu, should I disconnect at the cu and test down to the banana plug for continuity, like for the main bonding? Or keep it in place.
The cu is a schneider acti9 something or another so what can I remove to ensure the neutral to earth is disconnected so I can ir test or do I have to disconnect all conductors to do the ir
Thanks
The install bays have the cutout fuses in a adaptable box with just a banana plug on the earth. This then acts as the met up in the cu, should I disconnect at the cu and test down to the banana plug for continuity, like for the main bonding? Or keep it in place.
The cu is a schneider acti9 something or another so what can I remove to ensure the neutral to earth is disconnected so I can ir test or do I have to disconnect all conductors to do the ir
Thanks