Hi - got a job at an older 2br house to change out fusebox for CU. I haven't pulled the fuse but think it's likely 60A (common in area and place had gas CH and HW), recent smart meter and it's TNCS. It's got 16mm tails and less than 3m between meterbox outside front door and fuseboard at head level just inside. Tails are in good condition from what I can see and I hadn't planned to replace them (?). Meter has seal. Can't seem to recall about fuse seal.
First question - existing tails may not have slack to neatly position them within the new CU, as it's twice the size of the fuse board. If so, I was thinking to install an isolator in the meter box to give a kickoff for new slightly longer 16mm tails as this avoids touching the meter. Sound ok so far?
Next question - do I use metal or plastic for the isolator in the meter box ? If the cutout was inside I'd be using metal, but I'd also probably have a lot more room. Or if it needs new tails should I get Customer to order up an isolator from SSE (who will likely use a neat little plastic one) ?
Any suggestions welcomed, thanks
First question - existing tails may not have slack to neatly position them within the new CU, as it's twice the size of the fuse board. If so, I was thinking to install an isolator in the meter box to give a kickoff for new slightly longer 16mm tails as this avoids touching the meter. Sound ok so far?
Next question - do I use metal or plastic for the isolator in the meter box ? If the cutout was inside I'd be using metal, but I'd also probably have a lot more room. Or if it needs new tails should I get Customer to order up an isolator from SSE (who will likely use a neat little plastic one) ?
Any suggestions welcomed, thanks