Quoting for 126 kw installation split between two buildings. Both have heavy equipment running in each building each fed via own supply from one meter position.
Do I meter solar independently and have two separate installations (two FIT accounts) or have one sub-main feeding both solar installations either by DC or AC cables distance between each building approximately 10 m. Decisions decisions