Quoting for 126 kw installation split between two buildings. Both have heavy equipment running in each building each fed via own supply from one meter position.
Do I meter solar independently and have two separate installations (two FIT accounts) or have one sub-main feeding both solar installations either by DC or AC cables distance between each building approximately 10 m. Decisions decisions

Thanks

Jason
 
If there is only one MPAN then you only have a single site so one PV installation for FiTs. The FiT tariff is the same in any case, whether you end up in the 50-100 kW band or the 100-150kW band - 10.71p with EPC until 1st July.

I would check for the presence of any large voltage fluctuations being caused by heavy machinery being powered on/off. Could cause issues with the inverter.
 
I am not trying to fiddle the FITs but more for ease of installation. Each sub main is located opposite ends of the building 30 m away from each. Buildings are 10 m apart
 
We have a system similar to this with two meters and the suppliers just asks for them to be added together, they don't want individual meter readings although customer keeps a record of them.. Ecotricity by the way and they were very good to deal with.
 

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Green 2 Go Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses Heating 2 Go
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread starter

Joined
Location
Lincolnshire

Thread Information

Title
Any thoughts
Prefix
N/A
Forum
Green Lounge (Access Only)
Start date
Last reply date
Replies
3

Thread Tags

Tags Tags
thoughts

Advert

Thread statistics

Created
jason121,
Last reply from
Energetic,
Replies
3
Views
117

Advert

Back
Top