Hi all
Have my approved test next monday,this is a scottish thing god knows why Britain isnt as 1??? however i have to test 3 installations Domestic, Industrial and a main switch room! various tests on all 3 plus a one and a half hour exam, fault finding andsafe isolation. my ? is for a insulation test join all conductors through block to bypass neons?? and for fluorescent lights disconnect and put the cable into terminal block?? could i simply put the switch of to the fluorescent and switch the double pole switch of with the neon?? or as it should be 100% tested join the conductors thru!! a hope this makes sense!!! any help would be great thanks!!!
Have my approved test next monday,this is a scottish thing god knows why Britain isnt as 1??? however i have to test 3 installations Domestic, Industrial and a main switch room! various tests on all 3 plus a one and a half hour exam, fault finding andsafe isolation. my ? is for a insulation test join all conductors through block to bypass neons?? and for fluorescent lights disconnect and put the cable into terminal block?? could i simply put the switch of to the fluorescent and switch the double pole switch of with the neon?? or as it should be 100% tested join the conductors thru!! a hope this makes sense!!! any help would be great thanks!!!