I've opted for the ever popular CU change at home for my assessment Friday. So I started with a Wylex rat's nest, changed it for a nice Hager which should do the job. Then blood sweat and tears getting the gas bonding through, during which I discovered some 'alternative' junction boxes under the floor (thanks to the builder who put up the kitchen extension I presume).
Which leaves me with the borrowed neutral to sort out tomorrow, followed by some more testing, and stick on all the labels/tags. Then sit down Thursday and make sure all my paperwork ducks are in a row. Good fun this assessment melarky isn't it? :freak:
Which leaves me with the borrowed neutral to sort out tomorrow, followed by some more testing, and stick on all the labels/tags. Then sit down Thursday and make sure all my paperwork ducks are in a row. Good fun this assessment melarky isn't it? :freak: