Hi all...in reference to main gas bonding. Does it have to be within 600mm of gas meter/entry to property?Is this hard and fast or is it possible to put it as close as possible before any joints or tees?If it isn't hard and fast, what reg stipulates this in the BRB? Had a look and cant find it ...