Folks,
Doing a bathroom job presently and none of the lighting circuits have a CPC....it's an old topic I know and I'm aware of of requirements so I'll not be fitting that fancy bathroom spotlight!
However, what in theory is wrong with *temporarily* borrowing a CPC from the adjacent shower circuit while the circuit is re-wired? Not that I'm proposing to do this but I'm struggling with the theory...everything I've found in the Regs says what you should do but not what (or why) you shouldn't.
- Yes, CPC sizes are different
- Yes, if the shower is disconnected in future then the lights wouldn't be protected
- Yes, could introduce a fault from one circuit onto another
....but is that it?
Doing a bathroom job presently and none of the lighting circuits have a CPC....it's an old topic I know and I'm aware of of requirements so I'll not be fitting that fancy bathroom spotlight!
However, what in theory is wrong with *temporarily* borrowing a CPC from the adjacent shower circuit while the circuit is re-wired? Not that I'm proposing to do this but I'm struggling with the theory...everything I've found in the Regs says what you should do but not what (or why) you shouldn't.
- Yes, CPC sizes are different
- Yes, if the shower is disconnected in future then the lights wouldn't be protected
- Yes, could introduce a fault from one circuit onto another
....but is that it?