O
One_of_them
guys,
how do you incorporate the fuse down to 3A situation?
My mate has asked me to sort him a fan and wants it timed. It's an old board, rented property so no real chance of anything major going on. My thoughts are RCD fused spur, looping in & out on supply side to keep everything as normal there, load side with 3A fuse supply the bathroom light and then take the 3C from here to fan iso then onto fan? Therefore everything in bathroom is on 3A and RCD'd
Or is there another way?
how do you incorporate the fuse down to 3A situation?
My mate has asked me to sort him a fan and wants it timed. It's an old board, rented property so no real chance of anything major going on. My thoughts are RCD fused spur, looping in & out on supply side to keep everything as normal there, load side with 3A fuse supply the bathroom light and then take the 3C from here to fan iso then onto fan? Therefore everything in bathroom is on 3A and RCD'd
Or is there another way?