H
HUD
im in the process of taking over a job which has been first fixed by others its an old large garage converted into 2 story outhouse upstairs all the lighting and power cables have been wired using fp200 white or simeler and coverd in selotex board for insulation all ov the downlighter holes have been cut and ready to seccond fix is there an issue with the down lights set in the celing/roof when surrounded buy this type of insulation it has been cut larger before the plaster board was applyed