Hi All,
I currently have an electric shower in the house and I am looking to connect another in a chalet, which is approx 50 meters away from the house.
The chalet is fed from the main board of the house. There is a 3x16 SWA cable coming from the house to feed the chalet.
What is the best way to wire the 2 showers to allow the feed to automatically switch between both showers as required, but won't allow both showers to come on at the same time?
I'm aware of the priority/non-priority units but this would need a new cable to go from the house to the chalet which I'm looking to avoid. There is also a risk with an additional cable that if I turn off the main power to the chalet from the house, this cable could still be live in the chalet.
I currently have an electric shower in the house and I am looking to connect another in a chalet, which is approx 50 meters away from the house.
The chalet is fed from the main board of the house. There is a 3x16 SWA cable coming from the house to feed the chalet.
What is the best way to wire the 2 showers to allow the feed to automatically switch between both showers as required, but won't allow both showers to come on at the same time?
I'm aware of the priority/non-priority units but this would need a new cable to go from the house to the chalet which I'm looking to avoid. There is also a risk with an additional cable that if I turn off the main power to the chalet from the house, this cable could still be live in the chalet.