Hi,
I’m an industrial electrician, so when it comes to DB regs and such my experience on them is a little limited.
I need 2 x 16A 3 phase supply and 4 x 230v 3 pin sockets which is intend to do as a ring however, the nearest supply is approx 120m away! Running this through a cable calculator I’m being advised to run 16mm cable in.
I’m wondering if I’m allowed to put a consumer unit in about half way, and have each circuit ran from there?
This would be fed from a 100A supply DB. About 80A occupied but I’m unsure on being allowed a consumer unit from a db? Any additional info on how to tackle this would be appreciated like domestic regs an industrial lad wouldn’t often come across.
I’m an industrial electrician, so when it comes to DB regs and such my experience on them is a little limited.
I need 2 x 16A 3 phase supply and 4 x 230v 3 pin sockets which is intend to do as a ring however, the nearest supply is approx 120m away! Running this through a cable calculator I’m being advised to run 16mm cable in.
I’m wondering if I’m allowed to put a consumer unit in about half way, and have each circuit ran from there?
This would be fed from a 100A supply DB. About 80A occupied but I’m unsure on being allowed a consumer unit from a db? Any additional info on how to tackle this would be appreciated like domestic regs an industrial lad wouldn’t often come across.