X
xXDeltaXx
Hey,
I just want to double check on a few things as I cannot remember / find them anywhere...
We have an old boiler at work (circa 1989), it is wired via three-phase cables from the wall across a floor mounted cable tray (circa 1" offset) which has no cover.
The older cables within the tray are all SWA, but one or two of the newer ones (single phase) are not. Some are sheilded and one has a thin metal wrap around it within (I forget the name of the cable type - it's not MICC or anything similar).
As the tray is on the floor in a Boiler Room (risk of mechanical damage), is anything other than SWA appropriate for the tray?
Thanks
James
I just want to double check on a few things as I cannot remember / find them anywhere...
We have an old boiler at work (circa 1989), it is wired via three-phase cables from the wall across a floor mounted cable tray (circa 1" offset) which has no cover.
The older cables within the tray are all SWA, but one or two of the newer ones (single phase) are not. Some are sheilded and one has a thin metal wrap around it within (I forget the name of the cable type - it's not MICC or anything similar).
As the tray is on the floor in a Boiler Room (risk of mechanical damage), is anything other than SWA appropriate for the tray?
Thanks
James