Hello all,
I had to carry out a PIR today on a new loft extension, original builder went bust no EIC. The loft is being fed via a new RCD CU which is fed via a Henley block leaving a very old Crabtree non RCD protected board feeding the rest of the property, the loft contains one simple room, no extraneous parts etc.
The water service is bonded 6mm, the the Oil service is not bonded at all. The Main Earth conductor is 10mm via a ec15 type clamp fitted to a PILC cable (TN-S) system, this goes to the MET the old board is fed via a 6mm earth from the MET. The new board has a 16mm from the MET.
I have been instructed to PIR the loft ext only.
My question is - as the loft is a seperate board do the bonding/Earth regs of the original installation still have to comply I.E. Main Earth & Bonding be upgraded and oil boiler line bonded?
Any help appreciated as always - Thanks
Newpark7
I had to carry out a PIR today on a new loft extension, original builder went bust no EIC. The loft is being fed via a new RCD CU which is fed via a Henley block leaving a very old Crabtree non RCD protected board feeding the rest of the property, the loft contains one simple room, no extraneous parts etc.
The water service is bonded 6mm, the the Oil service is not bonded at all. The Main Earth conductor is 10mm via a ec15 type clamp fitted to a PILC cable (TN-S) system, this goes to the MET the old board is fed via a 6mm earth from the MET. The new board has a 16mm from the MET.
I have been instructed to PIR the loft ext only.
My question is - as the loft is a seperate board do the bonding/Earth regs of the original installation still have to comply I.E. Main Earth & Bonding be upgraded and oil boiler line bonded?
Any help appreciated as always - Thanks