J
jparker3007
hi guys
doing some remedial work to give a satisfactory grading after a periodic on a large commercial building, one of the items is the sizing of the gas bond. its done in 6mm. my argument is that it was designed that way when it was installed (30 years ago easily) so y does it need to be upgraded to 10mm? the other is the location of the water bond, no body knows the location of the incoming water services (managers been there 20 years and never found it) how can i give it a satisfactory without finding it? anydoby handy with adiabatic? lol
thanks
doing some remedial work to give a satisfactory grading after a periodic on a large commercial building, one of the items is the sizing of the gas bond. its done in 6mm. my argument is that it was designed that way when it was installed (30 years ago easily) so y does it need to be upgraded to 10mm? the other is the location of the water bond, no body knows the location of the incoming water services (managers been there 20 years and never found it) how can i give it a satisfactory without finding it? anydoby handy with adiabatic? lol
thanks