M
Mattrod
Hello sparks.
I have a job at the mo, on which i need a bit of advice on.
The property has a gas oven fed from a gas bottle, which is sited outside. It feeds straight through the kitchen wall into the cooker. I can't get to the pipe work behind the cooker, but will it still need a bond, say on the outside before it goes into the wall?
Also the centre heating is an oil fired. This is fed straight through the wall, again. I think I can just about get to the pipe work behind the boiler and bond there. Then do I just have to cross-bond the pipe work on the heating side?
Any advice received with thanks.
I have a job at the mo, on which i need a bit of advice on.
The property has a gas oven fed from a gas bottle, which is sited outside. It feeds straight through the kitchen wall into the cooker. I can't get to the pipe work behind the cooker, but will it still need a bond, say on the outside before it goes into the wall?
Also the centre heating is an oil fired. This is fed straight through the wall, again. I think I can just about get to the pipe work behind the boiler and bond there. Then do I just have to cross-bond the pipe work on the heating side?
Any advice received with thanks.