Hello everyone,
I am facing a similar problem in a bigger scale. we were told by a facility management in a building that (sometimes), 3 RCDs, on 3 different DBs trip at the same time! ( Normal ground floor DB, emergency DB in GF, Emergency DB in basement). then they switch them back on and everything works for another 2 weeks or so. ( normal DBs are fed through normal MDB and Emergency DBs through EMDB)
I am assuming there is a minor earth fault on one of the circuits in one of these panels and because of equipotential bonding throughout the whole installation via cable trays, GI trunkings and GI pipes, it somehow completes the circuit through other panels as well. can not explain it in any other way !
I guess the problem might be a minor loose connection on a connection terminal to equipment/socket or a slightly damaged wire somewhere in GI trunkings but not easy to do visual inspection on each circuit connection points either. (such as for the revolving door) and because it is not happening all the time, cant find it by a testing equipment either.
Any suggestion on why it is happening and how to find the solution?