I
ian campbell
Hi All
Just a quick question that i need some information on
I have recently had some one do some work in my office and it has taken me ages to get the BS 7671 from him but i think that it is wrong.
The work he done was removing a 16mm 3 phase and neutral tail from a joint meter box and reconnect to a separate meter box. (both offices on same floor where powered from same junction bock leading to only one office paying for the bill we required both offices to have separate power so both could be billed both meters were already in place in the junction box)
should he have gave me a certificate to say that the circuit was tested after the installation or should there be any other paper work with his 7671.
Thank you
Just a quick question that i need some information on
I have recently had some one do some work in my office and it has taken me ages to get the BS 7671 from him but i think that it is wrong.
The work he done was removing a 16mm 3 phase and neutral tail from a joint meter box and reconnect to a separate meter box. (both offices on same floor where powered from same junction bock leading to only one office paying for the bill we required both offices to have separate power so both could be billed both meters were already in place in the junction box)
should he have gave me a certificate to say that the circuit was tested after the installation or should there be any other paper work with his 7671.
Thank you