Had a lovely conversation/argument with building control this morning, the scenario is this,
Completed job (4 flat rewire) EIC’s sent to client as normal, building control notification done via NICEIC portal, all good (you’d hope)
Then received email from client (the architect) to inform me that the CERTS would not suffice as I quote “were not registered with building control” I contacted building control who informed me that all CERTIFICATES must be registered with building control within 30days of job completion, I attempted to explain that he meant building control (himself) must be notified of any works that have been carried out within 30days of completion and that EIC certificates (or any electrical certificates for that matter) are for myself to retain a copy and the client to receive a copy. This is below the response.
QUOTE.
“Although ——- is a registered competent electrician, under Part P it’s is a requirement that the electrical certificates are registered (in this case with NICEIC) within 30 days of the completion date with a Building Control compliance certificate issued by NICEIC with a copy forwarded to Building Control, I believe this is also a requirement by NICEIC as part of their rules. Please find below extract from Part P for reference.
Although ———- has confirmed over the phone that he has notified the certificates with Building Control this is not the case. I’ve just spoken to NICEIC where ———- has notified the certificate via the NICEIC portal this morning the notification is yet to reach us and will only reach from mid-night tonight.”
END QUOTE
As far as I was aware we don’t register certificates with anybody we simply supply certs and then certify our own work as compliant. I’m fed up if building control confusing EIC and building control notification. Has any one else had issues with them??
Completed job (4 flat rewire) EIC’s sent to client as normal, building control notification done via NICEIC portal, all good (you’d hope)
Then received email from client (the architect) to inform me that the CERTS would not suffice as I quote “were not registered with building control” I contacted building control who informed me that all CERTIFICATES must be registered with building control within 30days of job completion, I attempted to explain that he meant building control (himself) must be notified of any works that have been carried out within 30days of completion and that EIC certificates (or any electrical certificates for that matter) are for myself to retain a copy and the client to receive a copy. This is below the response.
QUOTE.
“Although ——- is a registered competent electrician, under Part P it’s is a requirement that the electrical certificates are registered (in this case with NICEIC) within 30 days of the completion date with a Building Control compliance certificate issued by NICEIC with a copy forwarded to Building Control, I believe this is also a requirement by NICEIC as part of their rules. Please find below extract from Part P for reference.
Although ———- has confirmed over the phone that he has notified the certificates with Building Control this is not the case. I’ve just spoken to NICEIC where ———- has notified the certificate via the NICEIC portal this morning the notification is yet to reach us and will only reach from mid-night tonight.”
END QUOTE
As far as I was aware we don’t register certificates with anybody we simply supply certs and then certify our own work as compliant. I’m fed up if building control confusing EIC and building control notification. Has any one else had issues with them??
Last edited by a moderator: