ok, need a lil help.
Cu approx 40 metres from meter.
in a block of flats.
total demand is 132A therefore after diversity
132A x 0.4 = 52.8 A (approx)
cable run in tray in cable duct in free air.
100A cutout fuse in place at mo. currently in 25mm armoured! is this enough?
lil rusty on this one as this is a sub main cable so is there a difference?
Cu approx 40 metres from meter.
in a block of flats.
total demand is 132A therefore after diversity
132A x 0.4 = 52.8 A (approx)
cable run in tray in cable duct in free air.
100A cutout fuse in place at mo. currently in 25mm armoured! is this enough?
lil rusty on this one as this is a sub main cable so is there a difference?