Hi all,
I am installing a new 3 phase DB and 110V DB. The current installation needs new DBS due to thier age and condition.
The cables used are all singles and ran in galvanised steel trunking and I am not replacing the single cores used.
My question is, is it alright to cut out a section in the DB that sits directly against a cut out section on trunking and use grommet strip to put around the cut out edges of the both the DB and the trunking so the singles can pass through safely?
Might sound like a daft question but I’m typically using SWA and tray when doing these jobs so have never came across the correct way to allow cable entry between metal trunking and a metal dB, keeping within the regs for IP and protection of cabling.
Any help is appreciated, cheers.
I am installing a new 3 phase DB and 110V DB. The current installation needs new DBS due to thier age and condition.
The cables used are all singles and ran in galvanised steel trunking and I am not replacing the single cores used.
My question is, is it alright to cut out a section in the DB that sits directly against a cut out section on trunking and use grommet strip to put around the cut out edges of the both the DB and the trunking so the singles can pass through safely?
Might sound like a daft question but I’m typically using SWA and tray when doing these jobs so have never came across the correct way to allow cable entry between metal trunking and a metal dB, keeping within the regs for IP and protection of cabling.
Any help is appreciated, cheers.