B
brizospark
Currently installing a large quantity of medium duty 200mm cable tray in straight runs
What I'm finding takes most time is joining the lengths with the god awful couplers that slide along the inside edge and bolt the two lengths together via 4 x roofing bolts each side...awful things, terribly designed and not the best to look at with the roofers (even short ones) sticking through the side of the tray
I can vaguely remember someone telling me that they now make clip style joiners, does anyone know of these and where i can purchase?
What I'm finding takes most time is joining the lengths with the god awful couplers that slide along the inside edge and bolt the two lengths together via 4 x roofing bolts each side...awful things, terribly designed and not the best to look at with the roofers (even short ones) sticking through the side of the tray
I can vaguely remember someone telling me that they now make clip style joiners, does anyone know of these and where i can purchase?