The floor of the kitchen will be filled up with:
1) Concrete, on top of which will go
2) insulation with pipework for wet underfloor heating system, on top of which will go
3) screed.
Can the armoured cable run under the concrete base or does it always need to go above concrete base and under screed (in this case, along with insulation and wet heating system)?
Thanks in advance.
1) Concrete, on top of which will go
2) insulation with pipework for wet underfloor heating system, on top of which will go
3) screed.
Can the armoured cable run under the concrete base or does it always need to go above concrete base and under screed (in this case, along with insulation and wet heating system)?
Thanks in advance.