Hi, I need to calculate the build up height on the ground floor so the builder can install the front door at the correct height.
The spec on anhydrite screed over wet UFH is:
Primer 0mm...
Read more
Continue reading...
The spec on anhydrite screed over wet UFH is:
Primer 0mm...
Read more
Continue reading...