S
Sparkypaul11
Hi all
I am quoting tomorrow to install some meters on a caravan site (x18). Is this work Part P notifiable??
I am unsure where the supply is taken from as have never been to this site so different scenarios would be helpfull to me.
Also what certification would be required EIC or just a MW for either replacing a meter or installing a new meter to the existing supply?
Regards
Paul
I am quoting tomorrow to install some meters on a caravan site (x18). Is this work Part P notifiable??
I am unsure where the supply is taken from as have never been to this site so different scenarios would be helpfull to me.
Also what certification would be required EIC or just a MW for either replacing a meter or installing a new meter to the existing supply?
Regards
Paul