Just a straw poll from you lovely gents as I would like to know what the general consensus is.
Moving floor boxes that are plugged into underfloor busbar systems, if they're unplugged and then back in again, would you do the minimum tests required, i.e. loop, polarity and RCD test if there's one in line, and note them either on a minor works or by some other method which is still traceable and accountable (i.e. works order/docket etc.).
Moving floor boxes that are plugged into underfloor busbar systems, if they're unplugged and then back in again, would you do the minimum tests required, i.e. loop, polarity and RCD test if there's one in line, and note them either on a minor works or by some other method which is still traceable and accountable (i.e. works order/docket etc.).