M
mike
hi. i wired a cupple of sockets and lights in a shed the other day it was fed with 4mm swa i put a sub main in. because there was structual steel it needed bonding so i put a earth steak in so the shed was a TT. my question is, on the certificate do i put the details of the cu where it is fed from on the certificate or do i treat the shed like its seperate and do the certificate just for the shed. thanks