Hi, this isn't exactly the right place for this but I didn't want to post this publicly ...
I'm installing a solar-powered pump for an allotments (i.e. the whole site) and as far as I can work out there are no notifications I need to do, I've obviously kept it all to BS7671 and the 3rd Edition but as I'm used to working on domestics, I'm used to filling out certificates and notifiying, and I can't see either what or to who to notify to in this case.
Details of the system are:
2 250W, 30-oddV panels in parallel, isolator, controller, pump (and various, complicated to me, pressure connections.)
Then loads of plumbing.
Do I fill out a cerificate or what?
Sorry if this is a stupid question.
I'm installing a solar-powered pump for an allotments (i.e. the whole site) and as far as I can work out there are no notifications I need to do, I've obviously kept it all to BS7671 and the 3rd Edition but as I'm used to working on domestics, I'm used to filling out certificates and notifiying, and I can't see either what or to who to notify to in this case.
Details of the system are:
2 250W, 30-oddV panels in parallel, isolator, controller, pump (and various, complicated to me, pressure connections.)
Then loads of plumbing.
Do I fill out a cerificate or what?
Sorry if this is a stupid question.