A
AndrewMgan1976
I have completed a Shower install with the plumber.
The flat already had a supply from Consumer Unit to 45A Pullcord switch, so I have extended from the switch to Shower.
My question is what certification to issue, MWC or EIC. I'm more inclined to issue MWC.
I'm in Scotland, so no need for notification to BC.
Thanks in advance
The flat already had a supply from Consumer Unit to 45A Pullcord switch, so I have extended from the switch to Shower.
My question is what certification to issue, MWC or EIC. I'm more inclined to issue MWC.
I'm in Scotland, so no need for notification to BC.
Thanks in advance