Hi,
This is a question for anyone who can help with DC etc and Leisure Batteries.
I have a 500w load at 12v, made up of.
75w car stereo which includes 15w per Chanel, and 425w of LED lights.
I have 5x 100Ah Leisure Batteries all connected in Parallel, total of approx 500Ah.
My load is 500w at 12v which is approx 42A.
I am going to be running the load on the batteries every night for approx. 5 hours, so draining the batteries by 200A.
My question is, how long does it take to charge a set of batteries from flat, and also fast charge them?
My problem is, I need to be able to maintain the battery level so that I can have this 500w load used for 5 hours every night for 30 days, I need to charge them every night.
Any thoughts on what the best way to do this is?
At the minute this doesn't quite exist, well it does, but its 20 years old and using inverters and mains powered stereo and lights with 3 batteries.
This is a question for anyone who can help with DC etc and Leisure Batteries.
I have a 500w load at 12v, made up of.
75w car stereo which includes 15w per Chanel, and 425w of LED lights.
I have 5x 100Ah Leisure Batteries all connected in Parallel, total of approx 500Ah.
My load is 500w at 12v which is approx 42A.
I am going to be running the load on the batteries every night for approx. 5 hours, so draining the batteries by 200A.
My question is, how long does it take to charge a set of batteries from flat, and also fast charge them?
My problem is, I need to be able to maintain the battery level so that I can have this 500w load used for 5 hours every night for 30 days, I need to charge them every night.
Any thoughts on what the best way to do this is?
At the minute this doesn't quite exist, well it does, but its 20 years old and using inverters and mains powered stereo and lights with 3 batteries.