Got to go and give a price for rewiring a chineese takeaway and the flat above;)

Is there any specific regs to do with commercial kitchens (bonding)etc

Not done one before and am looking forward to a free chinky while on the job:)
 
Got to go and give a price for rewiring a chineese takeaway and the flat above;)

Is there any specific regs to do with commercial kitchens (bonding)etc

Not done one before and am looking forward to a free chinky while on the job:)

Commercial kitchens with gas supply require that the supply & extract fans are both switched on and working before the gas solinoid can open. Also a gas emergency stop push button should be fitted at each door.

Fire alarm system should also be linked to shut down supply and extract fans via interface this in turn will shut off gas supply.

Just a couple of things to watch out for when pricing.
 
Wouldn't be so certain of that free chinky matey, tighter than a ducks butt them lot!! Done a bit of work at our local, not a spare rib in sight!!!!
 
Be careful if the flat is rented premises as the floor may need acoustic insulation if above the takeaway, this will have to be taken into account when running wires and doing cable calcs etc
 
Bear in mind it can get damn hot in kitchens as said above. A loft above a pizza oven I installed was 70 degrees........CENTIGRADE!!!!!!!!!
Also check as Sintra said if you need to allow for intake and extract controls, and also, if you need to wire for emergency switches to turn the gas off, I've seen these required before.

ps it's probably going to be running in fat and oil everywhere so invest in some disposable gloves and boiler suit!
 
Last edited:
as far as memory serves,

a spark re-wiring would not be responsable for the interlocking valve on the canopy as this comes under gas regs and involves knuckle dragging neandertal gas fitters. we would only be responsable for the supply to the control panel
 

Reply to Chineese takeaway in the Electrician Talk | All Countries area at ElectriciansForums.net

Similar Threads

Went into an MCCB, terminated very nicely thank you very much, however it was just me doing some training with crimping. 'introducing extra point...
Replies
11
Views
520
  • Question
none at all.... and the rcd trips within specification... test button operational.... nothing to suggest there's a problem until you take the...
    • Like
Replies
2
Views
512
  • Question
I have to agree with Baldelectrician on almost everything he says except one ! I wouldn’t be walking away I’d be running lol. Definitely if your...
Replies
13
Views
1K
You too? I thought I was in a unique position:anguished::coldsweat:
    • Like
Replies
5
Views
222
Promised a photo…. Remember, this was working…. And they managed to move in without hitting it…
    • Like
Replies
4
Views
291

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock    No Thanks