P
Ponty Massive
Afternoon all,
Just a confirmation question if i can. A mate as asked me to install a fused spur (in his kitchen) for a combi boiler he is having installed.
The CU is an old wylex, no RCD or MCB's, TNCS supply with what looks to be a 6mm earth supplying the board and 6mm bonding to gas and water. (The whole house is only on 3 ways - Sockets, lights and supply for old immersion heater)
If I was to run the cable from an existing socket in surface trunking, would this eliminate the need for an RCD? (OSG p22).
As this would be a modification to a circuit I understand I would also need to run new 10mm bonding to both services and run a new 16mm earth from the supply (which is in an outside cabinet along with the meter).
Thanks all!!
Just a confirmation question if i can. A mate as asked me to install a fused spur (in his kitchen) for a combi boiler he is having installed.
The CU is an old wylex, no RCD or MCB's, TNCS supply with what looks to be a 6mm earth supplying the board and 6mm bonding to gas and water. (The whole house is only on 3 ways - Sockets, lights and supply for old immersion heater)
If I was to run the cable from an existing socket in surface trunking, would this eliminate the need for an RCD? (OSG p22).
As this would be a modification to a circuit I understand I would also need to run new 10mm bonding to both services and run a new 16mm earth from the supply (which is in an outside cabinet along with the meter).
Thanks all!!