V
vibetime
Hi all, ive got a 3 phase board to replace in a commercial premise, the whole building had a EICR about a year ago, which was very thorough.( a mate did it)
My aim was to just test the circuits in the board to be replaced and issue a cert,the board feeds two sub mains aswell. just want to clarify this is adequate and that i dont need to test every sub main circuit to.
Cheers
My aim was to just test the circuits in the board to be replaced and issue a cert,the board feeds two sub mains aswell. just want to clarify this is adequate and that i dont need to test every sub main circuit to.
Cheers