Hi all
New here. Apologies if this is in the wrong forum!
I have a query regarding what will and won’t be possible with regard to a property I own in the north east.
The 3 bed semi is empty and being completely stripped out of all finishes and all services inc water and plumbing. Right back to the supply.
The question I have is - how far with the new install could I, not an electrician, go, for an electrician to be happy to sign it off once complete.
For example. I am chasing out and plan on wiring in all new circuits completely. All under the floorboards of the first floor or (in the case of Ff lighting) under the loft boards (but not under insulation!).
My plan is to do all of this and leave all the cables coming out of the top of the wall where I want the new CU to go.(not far from the existing one and the mains supply will reach as its closer to the meter). All cables labelled up an ready for an electrician to come and fit & wire in the CU (that I have already bought).
Please note I’m not after advice on how to do things or trying to do any electricians out of work! But this is all down to the cost which is why I am choosing this route.
My question is - would an electrician come in at the end of the job and install the CU to my labelled cables, test everything and sign it off? I am happy to take and show photos of work before it is concealed. And also I have all calculations, cable runs, sizes, anticipated loads etc all available to them if they wish.
I’m not any joe bloggs. I have a degree in construction management, diploma in surveying practise, years of working in construction. Run many million pound projects including procuring electrical drawings and contractors for commercial work etc plus worked as an elec’s mate for a year a while back. Not trying to show off just wondering if this would make a difference to show I’m not just joe bloggs trying to put brown and black together in a house and hope it doesn’t go bang..!
FWIW I could also competently fit and wire in the new CU but I imagine that’s a step too far for someone to come in, check, test And sign off ? (Though I wish it wasn’t?).
Thanks for your replies !
Tony
New here. Apologies if this is in the wrong forum!
I have a query regarding what will and won’t be possible with regard to a property I own in the north east.
The 3 bed semi is empty and being completely stripped out of all finishes and all services inc water and plumbing. Right back to the supply.
The question I have is - how far with the new install could I, not an electrician, go, for an electrician to be happy to sign it off once complete.
For example. I am chasing out and plan on wiring in all new circuits completely. All under the floorboards of the first floor or (in the case of Ff lighting) under the loft boards (but not under insulation!).
My plan is to do all of this and leave all the cables coming out of the top of the wall where I want the new CU to go.(not far from the existing one and the mains supply will reach as its closer to the meter). All cables labelled up an ready for an electrician to come and fit & wire in the CU (that I have already bought).
Please note I’m not after advice on how to do things or trying to do any electricians out of work! But this is all down to the cost which is why I am choosing this route.
My question is - would an electrician come in at the end of the job and install the CU to my labelled cables, test everything and sign it off? I am happy to take and show photos of work before it is concealed. And also I have all calculations, cable runs, sizes, anticipated loads etc all available to them if they wish.
I’m not any joe bloggs. I have a degree in construction management, diploma in surveying practise, years of working in construction. Run many million pound projects including procuring electrical drawings and contractors for commercial work etc plus worked as an elec’s mate for a year a while back. Not trying to show off just wondering if this would make a difference to show I’m not just joe bloggs trying to put brown and black together in a house and hope it doesn’t go bang..!
FWIW I could also competently fit and wire in the new CU but I imagine that’s a step too far for someone to come in, check, test And sign off ? (Though I wish it wasn’t?).
Thanks for your replies !
Tony