Went to survey a job for a pv install today and came across this mess lol.

edit: don't know why the photo loaded upside down, could one of the mods turn it round please if poss.


Hope this work for you
 

Attachments

  • [ElectriciansForums.net] Complete shambles.
    image.jpg
    342.5 KB · Views: 286
Its when someone calls you and says they need a new consumer unit, you turn up and find that, I always start scratching my head thinking why are things never straight forward! It should be easy enough on this to tidy up if thats what you are doing, I think there's more chance of faults on the circuits that a problem mounting a new board.
 
That is bad but you must have seen the like of it before.

Out of interest, where are you going to connect the PV array in?

Yes definitely seen the likes of this before. I think what got me was the customers attitude towards it when I said it needs replacing/tidying up I got the typical "it's been fine all the time I've lived here and I've been here 26 years". I've priced it to replace the lot with a high integrity board and will put the PV on a 16 A mcb or rcbo depending on installation method on the main switch side. Tbh I probably won't even get the job as no doubt some other firm will go in and price just to install a sub board off the Henley block that is there and I got the feeling off the customer that only the cheapest will do.
 
Last edited:
Well at least there are only 6 ? circuits and I see there's no seal on the Henley block.

Looks pretty standard for the time it was done, 60's?

I tried finding the cover for the 1st 3way 3036 board but that was no where to be seen, all the cpc's are twisted together in to a 30 A connector block (not that they would do much anyway as there is no main earthing conductor).


The Henley block load side of the meter is sealed but that's no bother. The only decent thing about it is the DNO have replaced the cut out and have provided a suppliers earth ready to be connected in to.
 
Its when someone calls you and says they need a new consumer unit, you turn up and find that, I always start scratching my head thinking why are things never straight forward! It should be easy enough on this to tidy up if thats what you are doing, I think there's more chance of faults on the circuits that a problem mounting a new board.

Definitely.
 
Yes definitely seen the likes of this before. I think what got me was the customers attitude towards it when I said it needs replacing/tidying up I got the typical "it's been fine all the time I've lived here and I've been here 26 years". I've priced it to replace the lot with a high integrity board and will put the PV on a 16 A mcb or rcbo depending on installation method on the main switch side. Tbh I probably won't even get the job as no doubt some other firm will go in and price just to install a sub board off the Henley block that is there and I got the feeling off the customer that only the cheapest will do.


Whenever i get that logic-free statement,i always tell the client the other side of that coin,and say "What never works,till it works,then never works?"....
you usually get a minute or two whilst you further probe their antique install,then they ask "Go on then,what is it?"....

You can then turn off your torch,step back from their intake with a pensive look,and reply "A Bomb".

I have lost the ability to be amazed,at the condition of some intake arrangements and their owners treatment of same....

I visited a large industrial unit,i know well,and was intrigued to find the reason why the incomer,switchgear,meters and fusing, were all dripping wet...A 1M by 3M array of MEM,BILL and GEC boxes,400A TP....A roof leak? Maybe a flood?

No,they had removed the cupboard around it,to open up another 150mm access at the door,found it to be very dusty (installed in 60's),and pressure washed the lot,from top to bottom! :dunce2:
 

Reply to Complete shambles. in the UK Electrical Forum area at ElectriciansForums.net

Similar threads

  • Question
To give you some idea....with my DNO, the question "Can you see arcing, sparking or smoking?" is 3.5 minutes into the automated call answering...
Replies
8
Views
699
  • Question
Ouch. Danger notice to customer in my book.
    • Like
Replies
1
Views
596

Recommended Sponsor News

Quickwire Now Sponsor ElectriciansForums.net

I am sure you will join me in welcoming our newest sponsors of ElectriciansForums.net - Quickwire! They have decided to join us after seeing you guys discussing their products here. Now we have an expert on board that you can chat to @Quickwire-Sam who will be happy to answer your queries!

[ElectriciansForums.net] Quickwire Now Sponsor ElectriciansForums.net


@Quickwire-Sam said "At Quickwire, we're all about speed, safety, and reliability. We're a family-run business, and every Quickwire connector is proudly made right here in the UK, ensuring noticeable quality. In short, Quickwire is the fastest connection method on the market. Whether you're an experienced electrician or a DIY enthusiast, Quickwire makes electrical connections ridiculously quick and easy. We're passionate about blending British craftsmanship with innovation. If you have any questions or if there's any way we can help, please just ask me!"

Exclusive Forum Offer! Free euro 2024 wall chart for first 10 responses!

Hi everyone,

We have 10 exclusive Uheat EURO 2024 Wallcharts to giveaway for Electricians Forum Members! The first 10 people to reply YES to this thread - I will message and get them sent out to you just in time for this years tournament! GO GO GO

PCBWay Now Sponsor ElectriciansForums.net!!

I hope you will all join me in welcoming our newest sponsor to the forum PCBWay! You can contact their friendly people by sending a message to @PCBWay who will be happy to answer your queries.

Welcome to the community and thanks for your sponsorship!

[ElectriciansForums.net] PCBWay Now Sponsor ElectriciansForums.net!!

PCBWay provides services including PCB Prototype and batch Production, PCB Assembly (SMT), 3D Printing, CNC Machining, PCB Design, Electronics Modules Selling, etc. We are committed to meeting the needs of global makers from different industries in terms of quality, delivery, cost-effectiveness, and any other demanding requests in electronics.

[ElectriciansForums.net] PCBWay Now Sponsor ElectriciansForums.net!!

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top